• The construction of Management the three mini-hydros in • Establishment of a reCharlotte, Bankasoka and gime for regulating Makali has been completwater supply and sewed. erage services which • The Ministry has effectively balances signed contracts to supeconomic, financial, ply, install and commission and social objectives; thermal generators in Port and Loko, Moyamba, Kailahun, • Enactment of a new Kabala, Kambia, Bonthe, Water Law which creKamakwie and Pujehun. Water pump installation ates a legislative frame• Parliament has also work for all those inratified the agreement between the Government volved in the sector—public and private, present and the Abu Dhabi Fund for Development in reand future—and supersedes outdated water-relatspect of the installation of a 6MW Solar Park to ed legislation. serve Newton and its environs. Three bills designed to unlock the potential of the sector • By June, 2017, stand-alone solar systems will be installed in 50 Community Health Centers nationin water resources management are now at an advance wide. stage. Government has also taken steps to provide safe • The rehabilitation of 6 power plants in Makeni, supply to 700,000 people in several provincial areas, Blackhall Road and Kingtom is also on track. and improve access to water and sanitation in Pujehun, • The rehabilitation of generation and evacuation Kono, Kambia Koinadugu and Bonthe. Steps are also networks to reduce technical losses is at an adfar ahead in providing additional 422,600 people in vanced stage these districts with access to safe drinking water. To build a financially sustainable and scalable water ser- • Completed the Environmental Impact Assessment for the Bo-Kenema upgrade vices model, an operating cost recovery strategy will • Installation of 22,000 pre-paid meters to increase be piloted in small towns. In order to protect our enviaccess to customers nationwide and to boost revronment with a view to sustain our water and other liveenue generation lihood sources and to mitigate vulnerabilities to climate • Framework agreement signed with the Anti-Corrupchange, a spatial database for natural resources in tion Commission to curb electricity malpractices. Sierra Leone has been completed. The Environmental • Rural electrification scheme in high progress .The Protection Agency (EPA) has also developed a national African Development Bank / CLSG funded (EUR climate change policy. 374,400,000) Interconnector project involves constructing a 1,357 km transmission line allowing 3.5.10. Providing Energy power exports initially from Ivory Coast to Liberia, In spite of the challenges facing the country during the Sierra Leone, and Guinea. The interconnector aims reporting period, the provision of electricity continues to create incentives to explore the hydropower poto be central to the recovery and sustainable national tential in Sierra Leone and Guinea which, if redevelopment process of the Government of Sierra Lealized, would provide all the countries with an one. With the ambitious target of doubling access to increased supply of electricity to meet growing electricity to 250,000 households under the 24 months demand. Approximately 12.5% of the total project recovery programme, GoSL administration is seeking cost will finance rural electrification. The Governto double total operational power generation capacity ment of China in a bid to help Sierra Leone imfrom 75MW to150MW. prove its electricity supply in rural areas has fundTo achieve this goal, the following projects are being ed the construction of three mini hydro projects in implemented: APRM Sierra Leone | Annual Progress Report 43

Select target paragraph3