The
strategy
also
incorporates
monitoring
and
evaluation
as
a
key
focal
area
for
improving
environmental
sanitation
services.
6.25
Access
to
Energy
Supply
Government
adopted
both
short
term
measures
and
medium
to
long-‐term
strategies
to
address
the
energy
short
falls
in
the
light
of
the
energy
crisis
that
rocked
the
country
in
2006
and
2007.
The
short
term
measures
included
emergency
power
plants
installed
by
government,
VRA
and
the
private
sector
to
curb
the
situation.
These
include;
•
126
MW
power
plant
by
Government
•
126MW
gas
turbine
power
plant
by
VRA
•
80
MW
thermal
plant
at
Tema
by
a
consortium
of
mining
companies
•
50MW
power
plant
at
Tema
by
Wood-‐Group
and
Transdanubia
Limited
of
United
Kingdom
•
Government
approved
the
importation
and
free
distribution
of
6
million
energy
saving
compact
fluorescent
lamps
(CFLs)
to
replace
incandescent
filament
lamps
(IFLs)
to
reduce
cost
to
consumers
and
save
about
200MW
of
electricity
during
peak
periods.
For
the
long-‐to-‐medium
term,
government
acquired
220MW
gas
turbine
power
plant
from
Asltom
of
Switzerland,
concluded
arrangements
for
the
acquisition
of
84
MW
Gas
Turbine
Power
Plant
from
BHEL
in
India
and
another
50MW
Gas
Turbines
Power
Plant
from
Siemens
in
the
U.K
to
secure
power
supply
in
the
medium-‐term.
Over
2,000
MW
of
power
is
to
be
provided
by
Independent
Power
Producers
(IPPs)
of
which
Power
Purchase
Agreements
(PPAs)
have
been
concluded
with
4
of
them
(2007
Annual
Report,
GPRS
II).
150
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents