31
occupied by young people. This programme also serves as a channel through
which the fruits of growth are transmitted to the most vulnerable population
groups.
The activity of mining companies facilitated the creation of 5,517 jobs
including 3,795 jobs for nationals. The development of gold mining activities
also benefited some sectors of activity through sub-contracting. They include
BTP, supply of petroleum and chemical products, maintenance, security,
environmental studies. Sectors that benefitted from the development of
mining in our country were hotel management, catering, transport, transit,
banking, insurance, legal, fiscal and accounting consultancy.
Similarly, the Bagre growth pole project and the Samendeni Valley Integrated
Development Programme (PDIS) constitute important initiatives in the
promotion of private commercial activities, job creation and poverty
reduction, notably by improving food security.
Indeed, actions for promoting poles of growth were intensified in 2012, with
the effective restructuring of the Maîtrise d'ouvrage de Bagré (MOB). Decree
2012-1009/PRES/PM/MEF of 20 December 2012 creating the semi-public
company) called "Société de développement intégré du pôle de Bagré", in short
"BAGREPOLE", indeed completed this restructuring, after it was constituted
on 28 June 2012. It was preceded by the adoption in, September 2012, of a
master plan for developing the public utility zone, the creation of the bodies
of the semi-public company and adoption by the Board of Directors, in
November 2012, of the 2013-2017 Strategic development plan. The
institutional capacities of the Government and the MOB were thus
strengthened in the provision of services to the private sector and
improvement of investment climate in the Bagre project zone.
Furthermore, to establish the PDIS, an investment of 17 billion was set aside
for the year 2012. Ultimately, the first phase of the PDIS, estimated at a cost
of CFAF 78,325 billion, will involve the construction of a dam with a capacity
of one billion cubic metres of water, irrigated areas and equipment of a
hydro-electric power plant and social investments. The ultimate goal is to
enable rural populations to undertake income-generating activities.