NEPAD/APRM/Panel3/guidelines/11-2003/Doc8
NEPAD/APRM/Panel2/country /10-2003/Doc
expertise, which will be compiled through a competitive process, and that
will be reviewed regularly. This pool of expertise represents an
opportunity for African consultants to participate in the process, and
countries are therefore encouraged to disseminate information to
relevant stakeholders of their opportunities in this regard.
41. While the APR Panel and Secretariat will use African experts as
much as possible, they may also, in exceptional circumstances, utilize
the services of non-African experts, individuals or institutions.
42. The Country Review Team (APR Team) will be appointed to review
progress with the country’s National Programme of Action, as envisaged
in paragraph 13 of the APRM base document, and produce the APRM
report on the country. The services of the Pool of Experts and the APR
Partner Institutions can be utilised at different stages of the APR process,
including in supporting the self-assessments done by the participating
countries, in conducting Technical Assessments on specific issues of
particular concern to the participating country and the APR Secretariat,
or in participating in country visits. Such services will be contracted to
the member of the Pool of Experts and Partner Institutions by the APR
Secretariat under the direction of the APR Panel.
43. The Composition of the Country Review Team (APR Teams) will be
carefully designed to ensure an integrated, balanced, and technically
competent and professional assessment of the reviewed country and will
be approved by the APR Panel (APRM Organisation and Processes
Document, paragraph 5.1). It is expected that the APR Teams may
include:
A member of the APR Panel as the Team Leader;
The concerned officers of the APR Secretariat;
A member of the NEPAD Secretariat as may be required;
Experts from the Pool of Experts and, possibly from Partner
Institutions. The list of the Pool of Experts shall be approved by the
APR Panel. The APR Panel shall recommend the list of Partner
Institutions to the APR Forum. The list of the Partner Institutions
the APR Forum;
e. One observer from each Partner Institution that conducted
technical assessments in the course of the review;
f. Two observers at technical level from two other participating
countries, as a peer learning process;
a.
b.
c.
d.
44. The Country Review Team (APRM Team) will be established at the
outset of each country review process. The APRM Team will visit the
country concerned to carry out the widest possible range of consultations
Page 15 of 20