Infrastructure
Customers in the hinterland are supplied by 354 production centres operating 480 boreholes, 70 full
treatment plants and a 9,686-kilometre section of the network. Current production stands at 200,000
m3/day.
Emergency Programme
In the face of these serious deficits, the government decided to introduce an emergency programme involving
the fast-tracking of on-going projects and rehabilitation of the production centres. This ensured the
following:
- rehabilitation of 44 production centres in 2012, including 10 regional county towns and 30 administrative
divisions at a cost of 5.75 billion and a reviewed production capacity of 5,000 m3/d;
- boosting of potable water supply for the town of Man, BID-MAN at a cost of 7.2 billion and completed since
30 December 2012, with a production capacity of 12,000m3/d;
- boosting of potable water supply for the towns of Daloa, San Pedro and Tabou a cost of 14.8 billion for a
capacity of 33,475m3/d with financing from the European Union;
- boosting of potable water supply for the towns of Korhogo and Bouaké at a cost of 13 billion with financing
from the World Bank.
Table: Emergency Works in Towns of the Hinterland
Description of Project
Boosting of potable water supply at Man
Boosting of potable water supply in the towns of
Daloa, Tabou and San Pedro
Boosting of potable water supply in the towns of
Korhogo and Bouaké
Boosting of production in 44 towns
TOTAL
Financing
Amount
(millions of
F CFA)
IDB
7,200
EU
14,800
PUIUR/WB
13,000
BSPPU
5,750
40,750
Timeframe
for Delivery
of Works
30/12/2012
12/12/2012
30/12/2012
30/12/2012
The overall objective is for the water needs of the people to be met.
Strategy
The strategy for the reduction of the shortfall in the towns of the hinterland consists of the following
measures:
- rehabilitation and facelift of existing systems, and
-extension of existing networks.
Once the existing systems have been upgraded and demand is met, water supply systems should be
developed for new towns which do not have access to same, by giving priority to more densely populated
towns.
Furthermore, as an overarching measure common to that of Abidjan, social connections and public
standpipes should be developed.
On-going Works
As a matter of priority, on-going projects have to do with rehabilitation, boosting and extension works for