to alleviate problems of water shortages in Lupane, Masvingo, Chiredzi and Mwenezi towns. The completion of dam projects will assist in the adaptation to the climate change effects and increase in water supply. Zimbabwe’s climate change vulnerability is expected to be in terms of water shocks (floods and droughts). Water development projects have been seen as key in increasing the country’s storage capacity to supply current and future requirements. The projects will be used for different functions which include water supply, irrigation, hydropower generation and flood control. The Gwayi-Shangani, Marovanyati, Mutange Dams are some of the projects that the Government is working on. Upgrading of Water Supply Projects 20.13. Rehabilitation and upgrading of water supply projects is being done in Harare (Morton Jeffrey Waterworks), Beitbridge, Victoria Falls, Lupane and Binga water supply as well as Mtshabezi and Wenimbi pipeline. These projects are being done to reduce increased population pressure on limited services. People gain directly from improved access to basic water and sanitation services through improved health, averted health care costs and increased productivity and time saved. The projects are mainly funded under the Public Sector Investment Programmes. Roads 20.14. Government has embarked on a programme to revamp the road network. Accordingly Plumtree-Forbes border post road has been completed and Government is working on the rehabilitation of the Beitbridge-Chirundu highway. Power Generation 20.15. Government completed work on Kariba South Hydro Extension and work on Batoka and Hwange thermal power generation projects is still ongoing. Page | 55

Select target paragraph3