119
Activity by APRM
Objective
copies of the
Pastoralism Outline Act
(LORP) and 395 sets of
7 implementing
instruments
Bouli (number): 22
Pastoral boreholes
(number): 111
Solar pump boreholes: 3
Dam (number): 0
Pastoral water
facilities are
constructed
Number of
pastoral water
facilities
provided by type
Cattle tracks are
constructed
Length of cattle
track established
Marking out of cattle
tracks: 225km
Delimitation of cattle
tracks: 150km
Indicative Actions
Progress Toward
Achieving Results
(change in basic
conditions of expected
results)
Expected Results
as Specified in the
NPoA
Required Actions as
Specified in NPoA
Schedule
MRAH
Strengthening of
legal and
regulatory
framework for
access to pastoral
resources.
MEF
MEAHA
MEDD
Main Monitoring
& Evaluation
Agency
Main
Stakeholde
rs
Remarks/
Observations
Activities for
Subsequent
Phase
OBJECTIVE 4: ENSURE SUSTAINABLE ACCESS BY ALL CITIZENS, ESPECIALLY THE RURAL POOR TO WATER, SANITATION, ENERGY, FINANCE, MARKETS ICT,
HOUSING AND LAND
Improve
geographical
coverage of national
territory of SFD
Ensure wide
coverage of territory
by SFD
Undertake a review
by preparing a general
report on the sectors
in 2012
Overhaul the
All the SFDs are
Strengthen the
2012-2016
2012-2016
Prepare a 2012
general report on
the development
of the
microfinance
sector of
Burkina Faso
The status of the
geographic location of
SFDs in the country is
established and
uncovered areas
identified
SP-PMF
SP-PMF
Ongoing
Put in place a
favourable
framework for the
creation and
extension of SFDs
in the uncovered
areas
Identification of
The control structure is
SP-PMF
DSC/SFD
Necessary funds
Develop