114
Activity by APRM
Objective
Expected Results
as Specified in the
NPoA
Required Actions as
Specified in NPoA
Schedule
Indicative Actions
2011-2012
Adhere to payment
schedules
Reduce lead time for
paying road
maintenance SMEs
Payment times are
reduced
Ensure the regular
functioning of FERB
Undertake the rail
link between
Burkina and Niger
The potential of BF
as a hub increases
Expand the railway to
the Sahel and
Niamey
2011-2012
Existence of a
railway line
Implement a new
institutional
framework by
passing the sector’s
Outline Act
2011-2012
Existence of
implementing
instruments of the
sector Outline Act
Promote transport
industry and
improve goods
transit conditions
Activity by APRM
Objective
Expected Results
as Specified in the
Required Actions as
Specified in NPoA
Schedule
Indicative Actions
Progress Toward
Achieving Results
(change in basic
conditions of expected
results)
Main
Monitoring
&
Evaluation
Agency
Main
Stakeholders
The payment schedule
has reduced to 20 days
starting from the date
of submission of
certificates to FER-B;
Financial and
accounting
administrative
procedures adopted;
Putting in place a
private-type of
accounting
Engineering study
underway
MIDT : FERB
MIDT; MEF;
PME
Pursue the FER-B
empowerment
process
MIDT :
SOPAFER-B;
SP-PST;
DGESS.
Finalize the study
and search for
funds to finance the
project
An outline act on land
transport exists;
MIDT :
DGTTM
CBC;
SP- PST.
MIDT;
Private sector
ECOWAS;
WAEMU;
MEF;
NEPAD.
MIDT
Transport
Union
The draft implementing
instruments were
prepared and validated
at the ministry;
Setting up an
information centre on
trade and transit at
CBC Dakola (Burkina
Faso-Ghana border)
under the alliance
Progress Toward
Achieving Results
Main
Monitoring
Main
Stakeholders
Remarks/
Observations
Activities for
Subsequent Phase
Conduct the
following studies:
- Study on the transit
conditions of goods
from Burkina Faso
through the various
transit ports in the
country;
- A marketing study
Remarks/
Observations
Activities for
Subsequent Phase